DOUBLE INSPECTION BEFORE DELIVERY
All of the components and concrete batching plants are pre-installed in thefactory during production and before shipment, and both mechanical andelectrical checks are performed during this process. In this way, the wholeproject is planned meticulously and realized timely and flawlessly with themost advanced technology and quality.